3 coworking offices on the 2nd floor (Bouvreuil)
Closed offices in a coworking space
Explore the photo gallery






















Surface details
- 3 coworking offices – 3 spaces of 17, 22.5 and 21.6 m²
- Closed offices in a coworking space
- Total available surface: (combo) 44.1 m²
- Floor plan
Specific amenities
- 2nd, Coworking offices, Coworking with a private office, Furnished, Private enclosed office, Private mailbox, Private offices, Shared kitchen, Shared meeting room, Shared restrooms
Amenities details
Floor with existing partitioned office layouts.
3 units remaining: 17m² and 2 of +/- 22 m² (which can merge into +/- 44 m² )
- Meeting room, kitchen, and restrooms are shared
- Water fountain available
- Individual named mailbox – no mail service
- Highly energy-efficient heating and air conditioning with optimized air circulation for energy recovery
- Active ceilings, with horizontal acoustic barrier
- Access for people with reduced mobility
- Fiber optic infrastructure
- Free 24/7 fitness
- VIP reservation for the Campus conference room (fully equipped, up to 99 people)
- Air-conditioned IT room
- Quality, optimized, and modern equipment
- On-demand services
- Networking & business community
- Soft mobility solutions
Additional services included
Being a tenant gives you access to all these free services for the comfort of your teams
- Terraces
- 24/7 Fitness room
- Shuttle to the station morning and evening
- Self-service restaurant
- 3 fitness classes per week
- On-demand shuttle to travel within the zone and the village between 11 AM and 3:30 PM
- Networking events
- Sports events
Services available
These services are reserved for you and require a usage fee.
- Electric car sharing
- Event room for up to 99 people
- 120 electric charging stations
Technical details
- Ceiling height = 2.62 m maximum /2.20 m in the parking lot
- 1 elevator centrally located in the heart of the building
- Secure access
Digital and interactive signage - High-performance insulation, double glazing
- Raised floors for floor box installation
- 2 restroom blocks (m/f) per level
- Necessary connections for kitchen hook-up
- EPC: A (energy consumption) C (envelope)